Abstract:
This paper describes the background, content, and use of a
newly created document derived from the “Reliability
Centered Maintenance (RCM) Scorecard.” The RCM Scorecard
document is organized around a set of metrics developed by
Anthony M (Mac) Smith (author of the Reliability Centered
Maintenance
text and co-author (with Glenn Hinchcliffe) of RCM:
Gateway to World Class Maintenance).
The latter text addresses analysis during RCM projects and
provides examples of metrics from many real (fully
identified) clients.
The RCM Scorecard provides prospective RCM project managers,
their supervisors, champions and team members with sets of
metrics or key performance indicators (KPI’s) they should be
aware of that define results from four (4) phases of any RCM
effort they are likely to undertake regardless of the RCM
approach chosen or the asset to it is applied. The phases
addressed are called “Decision,” “Analysis,”
“Implementation” and “Benefits.” The new document, entitled
the “RCM Project Manager’s Guide,” uses the RCM
Scorecard as a base and also contains:
-
explanations on pitfalls to avoid,
-
success factors that work and
-
readiness factors an organization must ensure are in place
prior to committing further on an RCM project (i.e., during
the Decision Phase).
Background:
As differing approaches to the methodology we now call RCM
began appearing, a major controversy emerged within the
Maintenance and Reliability (M & R) community concerning
which approach to RCM was “best” in terms of benefits to
users and protection against legal liability in the event of
major catastrophe involving an asset to which RCM
methodology had been applied. This erupted strongly after a
series of conference papers and professional magazine
articles appeared that touted SAE Standard JA1011 RCM as the
only valid, legally defendable approach to RCM.
The defense was based on good logic and used graphic,
world-famous examples such as the Bhopal, India, December
1984, Union Carbide plant disaster, but showed no direct
relevance to any given RCM approach used before such
incidents per se.
In an effort to quiet the controversy it was proposed
initially that a set of metrics could be used to define the
results of any RCM effort. Later, the concept of developing
an approach to covering all phases of a project was proposed
to provide a metrics-based method of evaluating progress and
benefits during its various phases. Ultimately, comparison
of approaches to RCM became subordinate to simple use of the
various metrics to help manage and evaluate results of an
RCM project.
The effort to produce the RCM Scorecard was supported by
Reliabilityweb.com. It was facilitated by the author of this
paper, by then a former RCM practitioner with over 30
years experience with the various approaches to the
methodology who no longer competed for RCM analysis work and
had gone on record as a neutral observer pledged to focus on
the positive aspects of RCM in all of its forms.
The resulting document is the result of a truly
collaborative effort, now available free of charge to all
who have an interest in it.
A draft RCM Scorecard was made public via Reliabilityweb.com
in January 2005. A workshop was convened in March 2005 to
discuss and refine the approach. The workshop was attended
by over 100 persons from many different types of
organizations from 16 countries. A significant number of
leading practitioners of the various approaches to RCM
participated as contributors and co-facilitators of breakout
sessions addressing the four phases mentioned above. The
result of this extensive, one day's effort was a consensus
regarding what the content of the RCM Scorecard should be.
The remainder of this paper describes the initial
controversy and it resolution in more detail. It also
describes what happened after the consensus document was
published and how it morphed into becoming the RCM Project
Manager’s Guide.
Revisiting the Controversy leading to the RCM Scorecard:
Any one having experience with an RCM-based maintenance
program after it is implemented can attest to its value and
effectiveness compared to earlier approaches to maintenance.
However, once more experience is gained in analysis and
actual implementation of results on several systems or
plants, it becomes apparent that patterns of failures,
failure modes and effects are present in many classes of
components (pumps, valves, motors, piping, instruments,
etc.,) regardless of their operating context, installer or
manufacturer. Performing full-blown RCM analysis on a system
very similar in design, function and operating context to
one already analyzed was also not always possible due to
limited finances, personnel assets and time.
Thus, a search began in the early 1980’s for means to obtain
close to the same results in similar assets using the
refined outputs from those analysis during which all of the
seven (7) steps and essential elements of “Classical” RCM
had been thoroughly documented.
This led to the development of variants and derivatives from
the Classical RCM approach and a stratification of RCM
methodologies as illustrated in the following figure.

The terms used in the figure above are defined below.
Classical RCM – The analysis approach described in the
United Airlines report to DOD in 1978
Super-Classical RCM – an approach that is more rigorous than
the Classical RCM methodology
RCM Variant – An RCM approach that skips or combines steps
found in Classical RCM or incorporates substitutes for or
supplements to Failure Mode and Effects Analysis in order to
reduce the time and resources needed for a project
RCM Derivative – an analysis approach that produces a
non-redundant, RCM-like set of tasks (Time Directed
Intrusive and Non-intrusive, Condition Directed and, Failure
Finding) derived from what is already in the Preventive
Maintenance and/or Predictive Maintenance (PdM) Program or
within the capability of PdM technologies used.
As RCM variants and derivatives began to appear, the
question of what constituted “real” Reliability Centered
Maintenance methodology was raised. U.S. military services
had by the 1990’s issued standards, instructions and
handbooks defining the steps required and the desired RCM
process to be followed. However, the key document, the
Military Standard, which is where the military services
defined “real” RCM, had to be abandoned when the Secretary
of Defense in the early 1990’s mandated use of commercial
standards wherever feasible. The services and other
interested parties began vigorous support for development of
an RCM standard that would serve commercial, utility and
government purposes.
The result was a proposed standard issued for membership
approval in 1999 by the Society of Automotive and Aerospace
Engineers (SAE).
Organizations and individual consulting practitioners
offering RCM services that adhered to the SAE RCM standard
began touting its merits and criticizing any approach that
did not. Participants at professional conferences with any
track that included the subject of RCM were exposed to the
criticism that anyone offering an “approach” to RCM that is
not in complete compliance with the SAE standard wasn’t
doing RCM. Adherents to the SAE standard strongly suggested
that practitioners of RCM-like analysis techniques drop the
term “Reliability Centered Maintenance” and the abbreviation
“RCM” from the title and description of their approach and
call it something else. Potential clients were advised to
avoid RCM variants or derivatives altogether. The fact that
many couldn’t afford or embrace (for many reasons) classical
RCM or the more rigorous approach prescribed in the SAE
standard was largely ignored.
Indeed some suppliers of RCM services developed
counter-arguments that implied anyone could
afford the approach because of the projected (largely
subjectively determined) return on investment that could be
expected. Since then there has been a concerted effort by
purveyors of all approaches to application of RCM to prove
that their approach is better, faster and cheaper, as
competition has grown in the field of RCM analysis. Unstated
was the reality that companies offering analysis services
were rarely involved with implementation and were well away
before much implementation and evaluation of the benefits
from any given project could be completely proven successful
or not.
Basically, the argument between practitioners centered on:
-
validity or completeness of results from any analysis
approach not in compliance with the SAE standard,
-
comparison between results from various approaches to
Classical or Super-classical RCM and
-
the liability and possible criminal prosecution exposure of
any practitioner that failed to use the most rigorous
approach.
Thus, you had not only the “ours is better than theirs”
argument but use of a “fear-factor” that was not without
merit. However, examples used had no validity in terms of
involvement with any more (or less) rigorous RCM approach.
There was no direct cause and effect proven by actual
history.
Purveyors of some RCM Variant methodologies claim the output
from their approach yields virtually the same results as
classical RCM methodology. Further, claims are made that
such results are obtained at a fraction of the cost of using
the classical approach. This claim was based initially on
independent analyses using classical RCM and an RCM Variant
methodology on a single system of a power generating plant
in the early 1990s. The comparison study was sponsored by
the Electric Power Research Institute (EPRI), which the
funded two analyses (one with a classical approach and one
with an RCM Variant approach - Streamlined RCM - developed
under EPRI sponsorship). EPRI used this result to convince
fossil utilities to adopt the lower cost approach to RCM
rather than nothing at all. The supporting contractor, Erin
Engineering, now part of SKF Corporation developed their own
version of the approach to RCM, SRCMTM.
The controversy reached a peak in late 2002 at the annual
conference of the Society for Maintenance and Reliability
Professionals (SMRP) in Nashville, Tennessee. There, a paper
was presented that showed radically different results from
application (by two different vendors) of two different
approaches (Classical and Variant RCM) in nearly identical
systems used in the same operating context in two plants
owned by the same company.
There are many reasons even with the most rigorous
methodology for attaining less than stellar results using
any RCM-based methodology. These may be generally defined as
readiness factors and “pitfalls” described in the new
document entitled “The RCM Project Manager’s Guide”
which is attached as an appendix to this paper. Readiness
factors and pitfalls are also discussed later in this paper.
Unfortunately, all this controversy made understanding and
any attempt to cooperate to gain knowledge of the relative
value or management of projects employing various approaches
to RCM very difficult at the time.
Resolution of the Controversy About Which Is the “Best”
Approach to RCM:
In a paper presented at the 2003 SMRP Conference it was
suggested that consideration be given by leading
practitioners of RCM (users, vendors, trainers, etc.,) to
cooperating for the purpose of creating a common set of
metrics for use in evaluation of projects, approaches and
benefits to clients.
It was suggested that metrics may be used prior to, during
and after a project to educate, assess progress and
determine benefits and/or return on investment. These
metrics may also be of value in assessing RCM team
performance and in selection of contractors to provide
support services and products. If industry members
cooperated, it was proposed that a more targeted set of
metrics may allow refinement for assessment of projects in
progress and for comparison of expected outputs of various
RCM and RCM-like (variant and derivative) methodologies.
Challenges were issued at various events, including RCM
overview workshops at the 2003 and 2004 SMRP Conferences and
during a paper on RCM describing the proposed scope of
effort at the first Maintenance and Reliability Technology
Summit (MARTS) in March 2004. Work began in earnest later
that year to develop the draft metrics-based document.
A number of prominent RCM practitioners accepted the
challenge and/or agreed to participate as reviewers and
advisors.
Reliabilityweb.com owner Terrence O’Hanlon, having been
cognizant of the controversy and in touch with those at the
center of it, decided to sponsor development of a document
that would outline an approach to metrics for RCM projects
that would be acceptable to a broad spectrum of
practitioners and possible clients for projects. He named
the project and the document that was to emerge from it “The
RCM Scorecard.” He decided to support a series of actions
and events that would yield a definitive result, including:
-
Development of a draft document, entitled “The
Preliminary RCM Scorecard” that would be the basis for
discussion and critique by anyone interested
-
Publication of the preliminary document on the Internet
for downloading and study for a period of over 2 months
prior to the RCM Conference in Clearwater Beach in March
2005
-
Facilitation of communications to the Scorecard content
originator and facilitator of comments and
recommendations for improvement of the document.
-
Sponsorship of a day-long Workshop at the RCM 2005
Conference for the express purpose of having a large
number of attendees reviewing and arriving at a
consensus on content of the document
-
Subsequent publication on the Internet of the resulting
“consensus” document for general reference by
non-commercial users without permission and by
commercial purveyors of services with permission.
Reliabilityweb.com followed through on all of the above
items.
Based on recommendations from the many participants in its
development, the RCM Scorecard was expanded from its
original five (5) tables (those first developed by Mac Smith
for metrics for the analysis phase of projects) to eleven
(11) tables of metrics, measures or KPI’s. Definitions of
terms used in the document were added for better
understanding. In addition, descriptive notes were added at
the beginning of the document to provide for consistent
interpretation of the numbers that could be derived. A 12th
table was added at the end to indicate what constituted
desirable directions of trends in metrics included in the
benefits tables of the document. As mentioned above, those
who took up the challenge at MARTS 2004 suggested that the
original purpose of the metrics (comparison of approaches)
be subordinated to what they considered more important uses,
which are listed below.
-
Provide RCM users, participants and other interested
parties with a “shopping list” or “menu” from which a
few pertinent metrics may be selected to help determine:
Ø
Whether or not to do any RCM analysis using any
approach on a given system
Ø
Progress during analysis and implementation and to
demonstrate how successful a given project is while it is in
progress and during the period afterward when benefits are
realized
Ø
How successful the project was in adjusting a maintenance
program for a system after completion.
-
Provide managers, supervisors or “champions” with a tool
to measure:
Ø
Progress on a given asset or set of assets during analysis
and implementation phases of a project
Ø
Benefits derived from the project during and after it is
complete.
The controversy over which approach to RCM is best seems to
have quieted down recently. It cannot be determined whether
or not publication of the RCM Scorecard influenced this one
way or other, but now the metrics are there for use if some
organization decides to fund a comparison effort.
It also appears that a consensus is building that all
approaches may be applicable to a set of assets in a
facility or mobile platform. The more rigorous approaches
may be used on the most critical assets (perhaps no more
than 20% of the total systems in a power generating plant,
for example) and progressively less rigorous variant and
derivative approaches to the balance of plant.
In some cases, conversion of a maintenance program to an RCM
basis may successfully employ Derivative and/or Variant
approaches for the least troublesome, “well-behaved”
systems. This may be done simply to reduce the maintenance
workload in order to free personnel for participation in
more rigorous analysis and implementation efforts on more
critical assets. Reduction of maintenance requirements is a
typical result of RCM analysis on systems that are very
reliable and/or which may be safely and more economically
“run-to-failure.”
Also, after publication of the “Consensus RCM Scorecard” in
April 2005, many other RCM practitioners took note of its
contents and began to suggest ways to build on the work of
those who had contributed to the document in the past.
In particular, practitioners of the late John Moubray's
approach (laid out in his book RCM II published by
Industrial Press in editions during the 1990’s) who were
initially critical of the RCM Scorecard, began to see the
value of the approach. Their fears that metrics would be
detrimental to a more rigorous application of RCM were
proven groundless, as the document is entirely neutral and
silent concerning the rigor of any approach. During and
after a workshop at the IVARA Maintenance and Reliability
Conference in October 2006, ALADON employees (by then part
of IVARA) and RCM II franchisees suggested ways in which the
document could be modified to become a useful “guide” for
persons assigned to manage RCM projects. Thus, the idea of
the RCM Project Manager's Guide was formulated by persons
who up to that time had been deeply critical and suspicious
of some of the content of the document used as its basis.
As a result of the events described above, sections
addressing "readiness to conduct an RCM project," “pitfalls
to avoid during execution of an RCM project” and “RCM
project success factors” were added, among some other
guidelines useful to prospective project managers,
supervisors, champions and project participants.
All of the items mentioned above had previously been
addressed in RCM overview and related workshops conducted in
many venues by the author of this paper since 2003. So, the
subject matter had been seen by upwards of 500 attendees at
these workshops. Comments from workshop critiques and
directly from participants during the session had been
progressively incorporated into the handouts used for the
workshops.
The RCM Project Manager’s Guide - New Content beyond the
Scorecard:
Purposes of the “Scorecard” document carried over into the
“guide” remain as previously stated. The guide has one
additional purpose, listed # 1 and stated as follows:
Provide leaders of RCM initiatives with the knowledge and
identification of tools needed to be successful.
The three additions concerning readiness, pitfalls and
success factors mentioned in the preceding section of this
paper are discussed next.
Readiness to conduct an RCM Project must be addressed during
the “Decision” phase of a proposed project.
Readiness
of an organization to initiate an RCM Project with a
reasonable expectation of success is different from the
decision to initiate one. After the decision is made,
the commitments made by early supporters must be carried out
consistently and continuously or failure may result.
Determination of readiness for success of an RCM Project may
be assessed using guidelines discussed below.
The designated or self appointed “champion” or prospective
RCM project manager (organizer) must determine:
·
Whether or not to perform RCM on the basis of expected
outcome
o
See metrics described in the attached document that may be
used and other factors below to consider in making the
decision
·
Whether or not you are starting a “pilot” RCM project or a
more extensive effort
·
What the level of outside support will be and for how long
it may be needed
·
Are you going to internalize the effort at some point?
o
If yes, do you have good candidate(s) for
facilitators/recorders internally?
·
Are you going to be able to get them adequate training,
experience and mentoring?
Level of outside support may be determined by:
·
RCM methodology or methodologies selected
·
Cost per system
·
Time commitment of internal RCM analysis and support team
members
Leaders of RCM projects under consideration must also
determine:
Ø
Level of resources to be made available to support the
project through all phases (Analysis, Implementation,
Benefits) including but not limited to:
ü
Funding
ü
Personnel to be assigned to the project
(must be your best support & Subject Matter Experts – SME’s)
ü
Facilities & Equipment - RCM Team work space, computer,
software
ü
Prior history of organization in change management –
bureaucratic elasticity – Will it work for a while then
return to what you did before?
ü
Steadfastness of management & supervisor support for new
initiatives
-
Is your organization saturated by the “Flavors of the
Month?”
ü
Likelihood of recommended changes in what maintenance
to perform being permanently adopted
-
Does your organization have a commitment to procedure-based
maintenance? If not how are changes to “stick?”
-
Are maintenance requirements routinely performed on the
basis of written schedules?
Having considered all of the above and determined that the
factors listed will not impede or defeat a project, the
designated organizer(s) must ensure commitments for outside
support are met.
After commitments are made for outside support needed,
organizer(s) must determine:
·
Who
is going to provide outside support?
·
Determined by what RCM approach(es) you are going to use
·
Want to assure during procurement phase that support
selected has adequate experience, a good track record and
credibility with prospective RCM analysis & implementation
team members
·
Availability of outside person(s) may be a factor
·
What RCM software is to be used and who will provide it?
Then the project manager must determine, coordinate and
schedule:
·
Training of analysis & implementation team(s) and support
personnel
·
Orientation of cognizant managers & supervisors
·
Start date(s) for analysis
o
Must ensure no conflicts with major events or peak vacation
periods
o
Set so most qualified & credible Subject Matter Experts (SME’s)
can participate on analysis and implementation teams
o
Ensure key internal support personnel will be available
o
Notify all prospective participants well in advance so no
one is surprised or given rationale for opting out
o
Advise everyone chosen of seriousness of their commitment
and expectations for constant participation in the long term
·
Availability of dedicated work space conducive to good
effort for duration of analysis & implementation phases of
the project
Must schedule/acquire:
·
Support equipment (computer & peripherals, RCM software)
Support personnel should assemble documentation needed by
the project team:
·
Maintenance history
·
Copies of PM & PdM procedures/schedules,
·
System & equipment tech manuals,
·
Performance standards,
·
P & ID’s and Electrical Drawings
·
Stockroom or in-place spares inventory lists,
·
Training manuals on systems and equipment,
·
Operating procedures & checklists,
·
RCM reference materials covering the approach(es) to be
applied, etc.,
The project manager must decide:
·
What reports are to be made and to whom
·
What the backup plan/schedule is in case of plant emergency
§
Include contingency for outside support
·
What the plan is for implementation
§
Recommend implementation start before analysis is complete
Avoidance of pitfalls and factors leading to success should
also be known by prospective RCM Project sponsors, champions
and participants. These are also addressed in the new
document as follows.
Given that the decision is made, based on readiness factors
described above, to conduct an RCM Project, the next
consideration for the project manager is to manage the
program so as to ensure success. Given that a large
percentage (estimated at 50% or more) of RCM projects fail,
a review of some of the reasons for failure might be
instructive.
RCM projects fail for individual as well as multiple
reasons. Some of the many pitfalls that cause failure and
that must be avoided are described briefly below.
·
Too much analysis and time off the “real” job required by
Subject Matter Experts (SME’s) either because proper
preparation wasn’t made in advance or the tools available to
support the analysis didn’t support high productivity.
·
Failure to provide for prompt, if not simultaneous,
recording of results of analysis so they are immediately
available to the team for each new day’s effort or failure
to provide a competent recorder of results (ideally from
inside the organization who can control and provide access
to them later).
·
Failure to plan, before analysis begins, for implementation
of results at the earliest possible time, resulting in delay
in realizing return on investment of time and resources in
the project.
·
Failure to pick a field-proven, RCM project software program
for use during and after the analysis phase – Constant
updating during and after initial analysis is difficult or
nearly impossible without good software because it causes
long delays between team sessions.
·
Manpower requirements and costs for training, orientation,
analysis and implementation are underestimated or ignored
resulting in lack of “buy-in” by stakeholders in the outcome
of the project
·
No “buy-in,” especially when created by outsiders without
any substantive input from stakeholders inside the
organization
·
Lack of failure data or will to conduct thorough Root Cause
Failure Analysis and Failure Modes and Effects Analysis and
follow-up or difficulty or impossibility of collecting data
on maintenance history or equipment failures
·
Failure to assign most experienced SME’s to RCM Analysis
either because they simply aren’t available or are able to
avoid such assignments
·
Lack of commitment by those who control assignment of SME’s
time and expenses, when the RCM project manager or
“champion” does not control the personnel assets assigned to
the project or the travel and living budget for those who
come from outside a facility to support the project
·
Failure to have those engaged in the analysis phase lead the
implementation of results
·
Too little knowledge of or aversion to PdM technologies –
clinging to time- based, intrusive tasks
·
Failure to involve parties skilled in predictive
maintenance, at least during the task selection step of the
analysis phase
·
Getting bogged down having to “slog” through analysis
results to identify “new” tasks to be scheduled and “old”
tasks to be deleted because analysis reporting mechanism
isn’t definitive enough
·
Review and approval chain too long and over-controlling,
causing unnecessary delays in implementation and subsequent
realization of benefits from the project
·
Culture of the organization really does not embrace change
or lacks a support mechanism for incorporating change on a
permanent basis. (See readiness factors.)
·
Lack of appreciation that the Analysis Phase is easy
compared to the Implementation Phase of an RCM project and
that the longer time between analysis and implementation the
lower the probability of ever getting tangible results
·
Lack of assurance that management will provide the resources
to support the whole effort or be supportive at all either
in short or long term
·
Failure to keep sponsoring “champion(s)” and other
stakeholders current on progress of the project and/or
selection of inadequate report elements (e.g., no meaningful
metrics)
·
Failure to select the right systems or components for
analysis – that is, the most troublesome with the greatest
payback potential
·
Committing to do analysis on too many systems at once or in
sequence before seeing any return on investment from the
first ones analyzed
·
Failure to ensure that any other initiatives being
implemented concurrent with RCM projects don’t interfere or
supplant them
Frequent, adverse outcomes of RCM projects, which imply
things to avoid, are:
·
Results under-utilized or ignored
·
Time and budget overruns
·
Deferred or truncated programs
o
No funding or manpower allowance for implementation
·
Living Program never established so as to provide for
feedback on items missed during analysis or that emerged
later and no follow-up to ensure prompt implementation of
new maintenance requirements
·
No attention paid to long term benefits realized from the
analysis (Benefits Phase too short to document return on
investment) which in turn results in RCM being
under-utilized and full potential never realized.
Conversely the requirements for success which should also be
in the minds of all stakeholders in the planned project
include but are not limited to:
·
Clear, understandable goals, objectives, and expectations
·
Strong and continuous management support
·
Dedicated staff
·
Ownership and continuity of assignments to the project
·
Processes and systems selected to gain best results
·
Strategic and rapid implementation
·
Accurate measurement of results
Conclusions:
-
The RCM Scorecard was initially conceived to settle a
professional controversy. However, it has evolved into what
may be a useful document, the RCM Project Manager’s Guide,
especially to those with little or no experience with this
methodology.
-
Although RCM methodology is approaching 50 years old, it is
still the best means to determine what maintenance
should be performed on an asset to get closest to what has
been designed in for maximum reliability.
-
Given what we learned while trying to settle the controversy
over RCM, all approaches to this methodology have merit
because of the fundamental truths it reveals when its
principles are embraced in any form.
-
A variety of approaches (e.g., Super-classical, Variant
and/or Derivative) should be considered for employment when
the goals are to convert to an RCM basis for all assets.
-
As first stated by Terrence O’Hanlon at a recent conference,
“A little RCM is better than no RCM.”