IR Thermometer Incorporates Twin Laser Identification Of Target Spot Location At Any Distance
With an overall size of only 4” (100mm) long x 2.2” (55mm) dia., Process Sensors’ latest addition to their family of compact, non-contact, on-line temperature sensors features dual, converging lasers that brightly illuminate the exact location of the target spot at any distance from the lens. This feature greatly simplifies sensor aiming, and eliminates ambiguity that could result in error readings.
The Model PSC-SSS-Laser-3M offers a wide overall temperature span of 50 to 600°C, a short wavelength, spectral response of 2.3µm, and selectable target spot sizes from 1.75mm at 70mm distance, 90mm at 3600mm, 0.7mm at 70mm or 36mm at 3600mm, depending on the selection of optics and model. The specification particularly suits the thermometer to secondary metal processing, and the measurement of oxides and ceramic materials.
Signal processing and programming electronics are contained in a rugged 2.75” X 3.5” (70 x 89mm) housing that can be mounted up to 9.8 feet (3m) from the sensor head as standard, or optionally 26 feet (8m) or 49 feet (15m), providing greater immunity from electromagnetic interference, mechanical shock, and high ambient temperatures. The sensing head is able to withstand ambient temperatures of up to 85ºC without cooling.
Functions provided by the signal processing and programming unit include: analog outputs of 0/4-20mA, 0-5/10V, and J and K thermocouple. Optional digital outputs are: USB, RS 232, RS 485, Profibus DP and Ethernet. Programmable parameters include emissivity and transmissivity adjustments, peak and valley hold, averaging, and extended hold with threshold and hysteresis.
Process Sensors’ “PSCconnect Software” supports sensor set-up, multi-tasking, graphic display of temperature trends, and data logging, and in general allows the user to customize the sensor to the application. More information can be found at www.processsensorsIR.com
Related articles
- Infrared Thermography: Making Wasted Energy Visible
- Investigating power outages at a plant that makes “mud”
- NFPA 70E-2012 Are You Ready for the Changes?
- Safe Electrical Work Planning & Plant Reliability
- The NFPA and Its Effect on Infrared Thermography and Your Infrared Electrical Inspection Program
- DO Sweat the Small Stuff: The Benefit of Inspecting “Small” Equipment With Infrared Thermography
- The Truth about Infrared
- Using IR for Condition-based Monitoring: Back to the Basics
- Leadership Q&A - Tim Rohrer of Exiscan
- Infrared Safari: A Photo Essay on the Hunt for Reliability Problems with Thermography

- Things to think about (and do) in 2011
- Reliability Polls and Quizzes
- Risk Calculation Methodology
- Understanding & Comparing Risk
- Preventing Mechanical Failures - An Introduction to Failure Mode Identification
- Stress: The Silent Killer - Part 1 of a 2 part series
(2) - The Continuous Journey
- Reliability Quiz - MRO Storeroom Quiz
- Championing SAP Plant Maintenance at Your Organization
(1) - Q&A with the 2011 Uptime Award Winners
- Reliability Polls and Quizzes
- Things to think about (and do) in 2011
- Electric Motor Bearing Greasing Basics
(4) - Asset Management: concepts and practices
(8) - CBM 2011 Video Proceedings
(2) - Reliabilityweb.com 100 Top Web Sites
- Maintenance of Hydraulic Systems
(2) - Aerial Infrared – An Asset Management Tool for District Heating System Operators
- Root Cause Failure Analysis Web Workshops
- Things to think about (and do) in 2010
(30)

- February 28
Motor Electrical Predictive Maintenance and Testing Training - March 19
RCM-2012 Reliability-Centered Maintenance and Root Cause Analysis Conference - April 17
Enterprise Asset Management (EAM) and Computerized Maintenance Management System (CMMS) Summit - April 24
Asset Operations Excellence Master Class and the Manufacturing Game - May 1
Focused Change Management for Reliability Initiatives and the Reliability Game - May 15
AM-2012 Asset Management Forum - June 5
CBM-2012 Condition Monitoring and Predictive Maintenance Forum - July 23
Infrared Level I Certification Course - October 3
Maintenance Strategy Master Class Level 1 - October 9
Focused Change Management for Reliability Initiatives and the Reliability Game

