Visite nuestro sitio en Español: Confiabilidad.net    RSS | Contact

MP-2 and You (Part Three) Seeing Colors in MP-2

September 1, 2010
(CMMS and EAM)

Another common misunderstood area of MP-2 is the SCHEDULING and UTILIZATION of crafts and employees. If established properly the calendar within MP-2 should be green, yellow, or red. There are a few things that must be established to take full advantage of SCHEDULING and UTILIZATION capabilities of the system. For example:

The site SCHEDULE must be established with the normal workdays for the site. If the site works 24/7 then the site SCHEDULE would be set to YES for each day. If the site normally works 24/7 and there are company holidays they would be established as EXCEPTIONS (i.e. Thanksgiving, Labor Day, etc.).  The MP-2 calendar will display these days in gray indicating it is a non-working day.
Employee SCHEDULES must be established for each employee. These should be populated with their true hours of availability. Although the employee may be paid for an 8-hour shift, their availability would be reduced for lunch, breaks, etc. Typically if they have a paid lunch and two 15-minute breaks per shift, their availability would be 7.0 hours per day. This time must be entered for each day normally worked. Just like the site SCHEDULE, employees can have EXCEPTIONS for vacation, etc to reduce hours of availability or increase hours of availability for overtime.
All work orders must have a craft identified, a crew size (number of crafts), and an estimated time to complete the activity.
If you have established the above correctly, you should see the MP-2 SCHEDULE displayed in green, yellow, or red. If you place your cursor over any given day Green indicates ample craft availability for the day and it displays the craft utilization percentage (0% - 80%). Yellow indicates 80% or above utilization, and red indicates 100% or more craft utilization. Now it’s merely dragging and dropping work orders on the day you wish to perform the work. Not sure where or how to get started with MP-2 and you, we can help.

People and Processes it’s more than a name, it’s about the people and giving them sound processes.

Sign up for our monthly newsletter to receive more tips and information regarding CMMS / EAM.
Register here for your copy: http://www.peopleandprocesses.com/newsletter_signup.php

  • The People and Processes Inc, Team measures our success on your results ~~ It’s about your success.

Tip provided by: Dave Bertolini, Managing Principal
People and Processes, Inc.
Tel:
+1 843.814.3795

people and processes

Previous tip: Asset Identification
Next tip: Optimize your PM program

« Back to all maintenance tips

Comments (1)

  • Colors can also be used for personalization.

    Change theme colors (dialog box headers, etc...) and also change texture, for example. Many mp2 customers like the basketball texture feel....was always a favorite of mine.

    Personalizing to your look and feel doesn't stop there...look at filters, modifying shortcuts to the, floating quick access bar, and report settings.

    The more you make it your own, the more in tune you become to the strengths of the product....and strength of the organizational opportunities!

    kevin.

    1) Posted 12:26 pm, 11 September 2010 by kevin price

Have your say

Comments are moderated prior to publication.
Please fill out the fields below.
Email addresses will never be published.

Comment guidelines

You can use basic HTML (a, strong, em, blockquote).
Links automatically use the nofollow attribute.
Off-topic or inappropriate comments will be edited or deleted.

Advertisement