Resistance-to-Ground Discharge Time
It is common practice to perform resistance-to-ground (RTG) measurements to verify the integrity of the Insulation System in a motor. It is also common practice to re-test a motor, when there are changes in the readings compared to previous test results or if the present reading is lower than expected. In many cases, the second test is taken immediately after the first one, giving a higher RTG reading. This is not an indication of motor health, but rather a higher polarization level.
As a rule of thumb, it takes about four times the charge time for the charging currents to fully dissipate. Therefore, if we perform a one-minute RTG test, it will take about four minutes for the charge to fully dissipate. If we perform a ten-minute Polarization Index test, then the discharge time would be approximately 40 minutes.
To ensure the most accurate test results possible, it is recommended to wait a minimum of four times the charge time, before taking a second RTG test.
Tip provided by PdMA Corporation
Phone: 813-621-6463
Previous tip: Work Types Tell the Tale
Next tip: Clean Sensor Placement is Key to Repeatability
« Back to all maintenance tips
Have your say
Related articles
- Implementing ESA as Part of Your Predictive Maintenance Program to Improve Electrical Reliability
- Are you smarter than your electric motors?
- Quiz - How well do you know your drives?
- Reliability Quiz - Take the Electric Motor Challenge
- Power Quality Surges in Importance - PQ is a Major Factor as Facilities Go Green
- The Quest For Maintaining Efficiency in Motor Repair
- Applying Power Quality Measurements to Predictive Maintenance
- Guidelines to a Good Motor Repair
- On-Line Electrical Motor Testing 101
- Motor Management Programs and an Auto Industry Success Story

- February 28
Motor Electrical Predictive Maintenance and Testing Training - March 19
RCM-2012 Reliability-Centered Maintenance and Root Cause Analysis Conference - April 17
Enterprise Asset Management (EAM) and Computerized Maintenance Management System (CMMS) Summit - April 24
Asset Operations Excellence Master Class and the Manufacturing Game - May 1
Focused Change Management for Reliability Initiatives and the Reliability Game - May 15
AM-2012 Asset Management Forum - June 5
CBM-2012 Condition Monitoring and Predictive Maintenance Forum - July 23
Infrared Level I Certification Course - October 3
Maintenance Strategy Master Class Level 1 - October 9
Focused Change Management for Reliability Initiatives and the Reliability Game

- Alignment and Balancing
- Asset Management
- CMMS and EAM
- Green Reliability
- Human Asset Management
- Infrared Thermal Imaging
- KPIs - Reliability Performance Metrics
- Lean Maintenance
- Lubrication
- Maintenance Management
- Motor and Power System Testing
- MRO - Spares Management
- Oil and Fluid Analysis
- Planning and Scheduling
- PM Optimization
- Predictive Maintenance and Condition Monitoring Management
- Reliability-Centered Maintenance
- Reliability Engineering
- Reliability Leadership
- Root Cause Analysis
- Shutdowns and Turnarounds
- Total Productive Maintenance (Asset Care)
- Training
- Ultrasonics
- Vibration Analysis



Comments
There are no comments for this article yet. Why not add one?